Environmental Management

As a global citizen, K C Engineering recognises its responsibility to protect and preserve our environment and resources and will continually work to reduce the enivornment impact of its operations and business activities. K C Engineering takes pride in its repuatation for quality and service, but technological leadership goes beyond the end product. How we impact the enviornment is important to us and we are developing our environmental management systems for ISO14001 accreditation.

See how our projects to conserve energy are reducing our carbon footprint with our quarterly energy consumption report:

CO2 Footprint Reduction Policy

Our environmental policy can be viewed here:
Supplier Purchasing Specification KCE.E-06

A History of Environmental Management:

2011 2.4 (H2, 2010) Tonnes of CO2 Offset purchased to maintain CO2 footprint at 2009 levels
2010 Upgraded molten tin bath insulating lid and temperature data logging to optimise start up time
2010 12.7 (H1, 2010) Tonnes of CO2 Offset purchased to maintain CO2 Footprint at 2009 Levels.
2010 Carbon Dioxide Reduction commitment of 10% per year for 5 years and a cap on CO2 footprint at 2009 level.
2008
Replacement of natural gas fired tin bath with new electric heated tin bath to improve energy efficiency and control. The original tin bath held approximately 7,000 Kgs of pure tin and the new electric heated bath holds approximately 3,500 kgs and ultises a curved base rather than a square base to reduce the thermal mass but still achieve the required depth for completely submerging large bearings.
2008
Replacement of factory lighting with low energy consumption lamps and light sensing system to automatically switch off lights when there is enough natural light during the day
2008
Installation of varible speed compressor into production facility. By using an motor drive system to control the speed of the motor, the compressor speed ramps up and down to match demand, far more efficient that our fixed speed compressors
2008
Complete pre-treatment of waste; 9 waste streams are in operation: Recylable material (paper, card, wood, plastic), contaminated oily rags and gloves, landfill, aluminium cans, batteries, CD's, CD Jewel Cases, Oil and coolant and aerosol cans. The scheme has been so successful a smaller land fill bin is now in use.
2007
Installation of small electric tin bath to complement larger gas fired bath, which allows the larger bath to be shut down when not in use and
smaller high volume parts to be processed in smaller tin bath.
2007
Environmental Managment Team established to develop ISO14001 Environmental Managment Systems. Team is formed with staff from all areas of th ebusiness
2007
All business flights are balanced by carbon neutral flights, using The Carbonneutral Company.
2007
Installation of efficient water boiler for canteen area
2006
Electronic fax server installed to reduce paper wastage
2005
Installation of motor drive unit on extraction fan motor unit to reduce speed. Saving 6 tonnes of carbon dioxide per year and 12,500 Kwh

2005

Waste management for hazardous oil contaminated cloths

2005
Waste management for recycling of wood, plastic, cardboard and paper
2004
Installation of energy management system to control 3 compressors; small, medium and large according to plant demand
2004
Passive lighting in washrooms
2004
Passive lighting in storage areas
2004
Recycling of aluminium drinks cans
2002
Hand dryers installed to replace paper towels in washrooms
2001
Whitemetal melting pots control system to manage energy consumption